2 months of SHOOTING is pretty standard. It is right now in it's 3rd stage. :)
A film schedule is composed of three phases:
PRE-PRODUCTION: ✅
This is getting approval to make the film and putting the plan together for making the film. The script has to be written, budgets have to be planned, sets have to be designed and built. Actors have to be cast. Locations have to be scouted. Clearances have to be obtained. Costumes have to be sewn. Stunts have to be planned.
PRODUCTION: ✅
This is the 2-4 months that just ended - the actual filming.
When the Director calls "that's a wrap" on shooting,
POST PRODUCTION: ✖️
The film is right now just a mass of raw footage. It can take two to three months to edit the film. Reshoots and ADR (dialogue looping) may need to be done.
Most modern films also involve visual effects, rendering will have to be done, color grading will have to be done, sound editing will have to be done.
Foley artists will have to go through the film, scene by scene, recreating sounds that the microphones didn't or couldn't capture. An M&E (Music and Effects) soundtrack, sans vocals, will have to be produced to facilitate international dubbing.
The composer will have to create the music for the film and record it, scene by scene.